GREEK LEADER PETROLEUM COMPANY CHOOSES CONCRETE CANVAS

The works were carried out by innovaland – Anelixis Constructions for Elin Oil Hellenic Petroleum Company SA, with consultation services provided by PowerServe Ltd Greece.

In July 2017, Concrete Canvas® GCCM* (CC) was used for bund lining at a petroleum tank farm in Athens, Greece. The existing bunds of the petroleum tank farm were subject to weathering and erosion affecting the ground’s integrity and failure of stability. The client required a long-term, durable and cost-effective solution to combat the issue.

In addition, Athens is subject to extremely hot weather in summer months, with temperatures often hitting highs of 48 degrees, which was putting the heavily vegetated bunds in danger of causing fires. As a result, a weed suppression solution was also required to prevent fires on the site, which could be incredibly dangerous on a site containing highly flammable fuel.

The chosen solution also had to be easily installed without interfering with the existing complex pipe infrastructure, while providing stability to infrastructure site-wide. Traditional concrete combined with Shotcrete was considered; however, there was a risk of rebound from shotcrete affecting the infrastructure and site environment, whereas CC would be totally safe and would provide a clean install. There were also site access issues, and traditional concrete methods would have required the use of heavy plant on site, which would not have been possible. As a result, CC was specified.

DSC_0577.JPG
LAYING ON SLOPE

CC was unrolled down the slope
DSC_0493.JPG
DSC_0276.JPG
DSC_0799.JPG
DSC_0343.JPG
DSC_0517.JPG
DSC_0520.JPG
IMG_0969.JPG
DSC_0601.JPG
DSC_1492.JPG
IMG_1199.JPG
IMG_1279.JPG
IMG_1298.JPG
IMG_2315.JPG

“6,400 SQM OF CC5TM WERE INSTALLED IN 9 DAYS”